Every stage of our process, from powder charge to cure time, is measured and controlled, so the numbers below hold on every batch, not just the best ones.

Benefits of Powder Coating

60-100kV

Electrostatic charge applied to powder for complete, even wraparound coverage

1.5-3Bar

Precise air pressure inside every spray gun for consistent deposition

150mm Spacing

Profile gap maintained to prevent corner shadowing (the Faraday cage effect)

10-15Min Cure

Hold time at target temperature for a fully cross-linked, durable finish

Our Mission

To control every variable in the coating process, from powder charge to cure time to film thickness, so each profile leaves our line with a finish that performs consistently, batch after batch.

Our Vision

To make precision, process-driven surface treatment the standard our industry is measured against, not the exception.
OUR PROCESS

Aluminium Powder Coating:
Step by Step

Aluminium powder coating is a dry finishing process that applies a protective, decorative resin layer to aluminium surfaces. An electrostatically charged powder is applied to the profile and cured under heat, forming a hard, continuous film that resists corrosion, UV degradation, and wear.

1. Surface Cleaning & Pre-Treatment

Every batch runs through a 7-tank pre-treatment line, completing the full cleaning cycle in roughly 25 minutes:

  • Cleaner Bath (8-10 min): Etches the aluminium surface and removes grease and oil residues.
  • DM Water Wash (2 Tanks, 4-5 min): Neutralises the section using demineralised water (0-10 TDS) for consistent surface quality.
  • Chromatising Bath (8-10 min): Forms a chemical conversion layer that strengthens powder adhesion and extends coating life.
  • Final DM Water Rinse (3 Tanks): Neutralises the section fully before it moves to drying.
2. Powder Application: Electrostatic Spray Deposition (ESD)

Aluminium profiles are earthed at zero potential while powder particles are given a high negative charge (60kV-100kV) inside the spray gun. The charged powder is drawn to the grounded profile, much like a magnet, and wraps evenly across the front, sides, and back of the section.

  • Hanging & Jigging: Profiles are hung vertically (never flat) on copper hooks or stainless steel jigs for consistent earthing, with a minimum 150mm gap between profiles to prevent the Faraday cage effect in corners.
  • Booth Entry: Profiles move through the automatic powder booth via overhead conveyor, inside a non-conductive stainless steel booth designed for clean overspray recovery.
  • Automatic Gun Application: Four automatic reciprocating guns apply powder from both sides of the booth, with two manual guns used for touch-ups and complex corners. Guns move in sync with a conveyor speed of 0.8-1.2 m/min.
  • Inside the Gun: Powder is fluidised with air in the hopper, charged at the nozzle electrode, sprayed at 1.5-3 bar air pressure, and deposited onto the profile through electrostatic attraction.
3. Curing & Baking

Curing is the controlled heating of the coated profile so powder particles melt, flow, gel, and cross-link into a hard, weather-resistant film. Because aluminium conducts heat roughly 3x faster than steel and can lose its temper above 220°C, curing is precisely calibrated: metal temperature of 180°C-200°C for 10-15 minutes, inside an oven held at 200°C-220°C air temperature.

  • Conveyorised Tunnel Oven: A 22-metre tunnel with three zones: Heat-Up (rapid rise to 180°C), Soak/Cure (10-15 min hold at 180°C-200°C), and Cooling (temperature reduction before unloading).
  • Melting Stage (~120°C-150°C): Powder liquefies and takes on a shiny, wet appearance.
  • Flow / Gel Stage (~150°C-180°C): Melted powder levels into a smooth film. This stage determines surface finish and prevents orange peel.
  • Cross-Linking / Cure (180°C-200°C, 10 min): The chemical reaction that hardens the powder into a durable polymer film. Timing is measured from the moment the metal itself reaches 180°C.
  • Exit & Cooling: Profiles cool in open air for 5-7 minutes (or with forced-air blowers) and are not handled until metal temperature drops below 40°C.
4. Quality Testing

Every batch is verified in our in-house quality control lab against recognised industry standards before it moves to packing:

  • Cross-Hatch Adhesion (ASTM D3359 / ISO 2409): verifies bond strength via lattice-cut and tape-pull testing.
  • Impact Resistance (ASTM D2794): confirms the coating resists cracking or de-bonding under sudden impact.
  • Mandrel Bend / Flexibility (ASTM D522 / ISO 1519): checks for embrittlement or over-curing by bending coated sections over a rod.
  • Film Thickness (ISO 2360): micron-gauge measurement to confirm consistent dry film build.
  • Boil / Hot-Water Adhesion Test: evaluates pre-treatment quality and wet adhesion by testing resistance to boiling water.
5. Inspection & Packing
  • Cooling & Inspection: Profiles are unloaded onto felt-covered inspection tables and checked under bright light for dust, orange peel, thin coating, or scratches.
  • Protective Taping: Premium orders receive a low-tack, self-adhesive LDPE protective film (60-80 micron) on visible faces, applied via automatic film applicator.
  • Bundling: Profiles are bundled in sets of 4, 6, or 8 depending on size, with standard bundle weights of 25-35 kg for safe handling.